Prevention, rather than protection
The New Work at Height Regulations re-emphasise
employers’ responsibility to ensure that work at height
is properly planned, appropriately supervised and
carried out in a manner that is safe.
Just to emphasise the dangers, Elizabeth Gibby, Head of
the Health and Safety Executive’s (HSE’s) Injuries
Reduction Programme, said recently; “In 2003-04, 67
falls from a height accounted for 67 fatal accidents at
work and nearly 4,000 major injuries. They remain the
single biggest cause of workplace deaths and one of the
biggest causes of major injury.”
Column or mast mounted lighting systems or other
equipment such as wind turbines and CCTV systems can be
mounted from 4m to 50m, presenting a significant risk to
anyone undertaking necessary maintenance of the
equipment.
There are numerous column and mast systems available on
the market, some offer no means of access other than
using an access platform or ladder, others often
incorporate climbing ladders with fall arrest systems.
However, the element of risk still remains as working at
height is still required, hence complicated risk
assessment and planning of work becomes essential.
There is an alternative, however. Abacus was the first
company to patent two unique lowering systems for
columns and masts, both of which eliminate the need to
work at height. The Raising & Lowering Winch mast, and
the base hinged raising and lowering mast, both allow
the equipment to be safely lowered to ground level under
complete control.
The Abacus RLW system has the advantage that the head
frame can be lowered to the ground using a manual or
electrically powered winch system enabling installation
and any necessary maintenance to be carried out at
ground level and in complete safety. The system also
offers long term cost savings for routine maintenance as
the need for expensive access systems are eliminated.
The key advantage of the Abacus RLW system is that it is
excellent in confined spaces, presenting an ideal
solution for applications such as Ports, Harbours and
Airports. The RLW system is available from 15m up to
50m, and can incorporate 250kg, 500kg or 1000kg winch
systems, incorporating twin or triple pulley systems and
latching system.
If sufficient space is available at ground level it may
be more economical in the long run to specify a base
hinged mast that can be lowered to ground level. This
makes maintenance easier and safer in many respects in
that no climbing and no high-level access is required.
Compared with winch masts, base hinged masts offer other
advantages such as being able to accept lighting
arranged to suit the site requirements without needing
to consider balancing the head frame. If additional
lights, signs or equipment are desirable these can be
fitted part-way up the mast without interfering with the
access to the main lighting frame.
Another important consideration is that the high mast
can be installed without the need for high lifting
cranes as the mast can be assembled at ground level and
then raised to its vertical position using the hydraulic
counterbalance. Base hinged masts undoubtedly offer one
of the lowest whole-life costs of any type of mast
thanks to the simple design and the way the
raising/lowering gear is not required for each
individual mast - one counterbalance can be used for any
number of masts at one or many sites. Base hinged masts
are available in a wide range of heights, from 12 to
50m, and can carry head loads up to 1½ tonnes, depending
on the design.
As a final thought, David Thomas, Principal Specialist
Inspector with the Health and Safety Executive (HSE) and
Project Group Convener, said: “Those who work at height
should never forget that gravity is no respecter of
persons. It affects everyone; too many times with
disastrous consequences resulting in serious, permanent
injuries or death”.
Email:
jclark@abacuslighting.com
Knauf Drywall ceiling plasterboard plasterboard insulated dry lining jointing
compound news 061006
Knauf Drywall dry lining tile backer knauf drywall wall lining news 300106
Knauf Drywall insulated plasterboard dry lining plaster board wall partition
news 020206
Knauf Drywall insulating board plaster boards knauf drywall drywall plaster News
200709
Knauf Drywall office partitioning insulation board plaster board dry lining news
120506
Knauf Drywall plaster board insulation board dry lining building insulation news
130306
Knauf Drywall thermal insulation plaster boards tile backer wall lining news
100406
Knauf Drywall tile backer insulation board plasterboard ceiling wall
plasterboard news 220906
Knauf Drywall tile backer wall lining insulation panels thermal board news
070706
Knauf Drywall tile backer wall lining plaster boards office partitioning news
220606
Knauf Drywall wall lining dry lining suspended ceilings wall plaster news 231006
Knauf Drywall wall partition tile backer wall lining plasterboard ceiling news
140606
Knauf Drywall wall plasterboard plaster boards plastering materials dry lining
news 270606
Knauf Drywall wall plaster plasterboard ceiling insulated plasterboard dry
lining news 010306
Knauf Drywall wall plaster thermal insulation insulation board plaster board
news 200206
KNX UK lighting controls lighting software building management systems lighting
systems News 200709
LED Lighting Technology led lighting systems led technology light emitting diode
news 250906
Levolux AT Ltd architectural louvres solar shade solar control architectural
systems news 010606
Levolux Ltd solar shading solar control external louvres louvres news 070706
Levolux solar shading brise soleil solar products louvres news 080206
Levolux ventilation systems solar shading louvres solar control news 090106
Lightning Generators generator kva generator equipment standby generator power
generators news 180106
London Development Agency demolition services construction services town
planning demolition recycling News 100107
Lonsdale Metal Co Ltd membrane roof roofing insulation roof products roof
skylights news 210606
LS Leaderflush doors external internal doors uk internal fire doors hospital
doors news 081206
LS Leaderflush Shapland internal glazed doors glass doors internal doors
external news 191006
LS Leaderflush Shapland panelled doors doors external internal door doorsets
news 071106
Lyons Sleeman Hoare architectural cad architectural software technical drawing
architectural design software news 270706
Marley Eternit cladding panels concrete roof tiles roofing cladding industrial
roofing news 081106
Marmax Products garden planters garden fencing timber decking outdoor seating
news 090306
Marmax Products Ltd plastic fencing recycled plastic outdoor planters plastic
planters news 041006
Marmax Products Ltd plastic planters plastic timber plastic decking plastic wood
news 200706
Marshall Tufflex cable management cable trunking floor box cable tray News
250309
Mavespace Ltd water damage pipe valve pipe cover water risk assessment news
071106
Mayfair Brassware bathroom tap kitchen sink taps lever taps basin mixer taps
news 220806
MDF Specialised Coaters Ltd powder coating mdf protective coatings fire
retardant powder coating news 230308
Arundel Jones Associates Ltd Registered in England and Wales No.
07334149 Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL Tel : 01622 745333
email copyright all rights reserved
News Categories : Abacus Lighting Ltd external
lighting industrial lights commercial lights outdoor garden light
|