Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Abacus Lighting provide:-

lighting solutions sports lighting landscape lighting industrial lightinglighting solutions
lighting solutions sports lighting landscape lighting industrial lightingsports lighting
lighting solutions sports lighting landscape lighting industrial lightinglandscape lighting
lighting solutions sports lighting landscape lighting industrial lightingindustrial lighting

Request Information

Home
Include Article
Advertise

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

 

 

   

The name behind Al Sadd

The Al Sadd Stadium, situated in Doha, Qatar is one of a number of new construction projects in preparation for the 2006 Asian Games. Working in partnership with United Electro Mechanical International, Abacus has recently completed the lighting of the newly built stadium.

Doha will be the first Arab city to hold this major event which will be the home of up to to 10,000 athletes. Completed at the end of 2004, the 20,000 capacity stadium is one of many new construction projects commissioned in preparation for Qatar’s hosting of the 2006 Asian Games.

The creation of the Asian Games City will involve the renovation and construction of 30 sports facilities. New facilities include Al Sadd Stadium, Al Rayyan Sports Centre, Al Ilihad Sports Centre, Al Arabi Sports Centre and Khalifa Stadium.

For Al Sadd Stadium, the lighting levels were specified to 1000 Lux maintained vertical to camera. The sports lighting system comprised of six head frames mounted around the perimeter of the stadium roof, with supplemental lighting mounted directly onto the roof. In total, over 158 Challenger 3 floodlights were used, all of which were fitted with 2KW metal halide lamps. Compactly designed and also incorporating an anti-glare baffle, Challenger 3 provides precision optical control and offers significant cost savings for both the supply and installation of Floodlights. Gun sight fixings are incorporated into Challenger 3, ensuring that the gun sight is easily fixed on site.

Of particular interest, all of the floodlights were fitted with hot re-strike facility. Hot Re-strike floodlight systems are sometimes requested for stadium floodlighting, where a disruptive power supply may occur. Instant re-ignition is then provided, if the power supply is restored within 7 seconds of interruption. Instant re-strike floodlights are installed to provide sufficient lighting on the playing field to allow competitive play to continue at a reduced luminance level, or to provide emergency lighting for spectators, officials and players.

Email: jclark@abacuslighting.com


Abacus Lighting exterior lighting commercial lighting landscape lighting industrial lighting news 160106

Abacus Lighting flood lighting lighting external abacus lighting lighting solutions news 160106

Abacus Lighting landscape lighting industrial lighting commercial lighting exterior lighting news 160106

Abacus Lighting lighting solutions sports lighting landscape lighting industrial lighting news 160106

Abacus Lighting Ltd architectural lighting outside lighting commercial lights exterior lighting news 210806

Abacus Lighting Ltd commercial lighting flood lights exterior lights lighting system news 030806

Abacus Lighting Ltd external lighting industrial lights commercial lights outdoor garden light news 030806

Abacus Lighting Ltd external lighting sports lighting landscape lighting outside lighting news 030806

Abacus Lighting Ltd external lights landscape lighting exterior lighting flood lighting news 030806

Abacus Lighting Ltd light design exterior lighting commercial lighting abacus lighting news 030806

Abacus Lighting Ltd sports lighting landscape lighting outside lighting flood lights news 030806

Abacus Lighting Ltd sports lights big lights football lighting abacus lighting news 030806

Access Irrigation irrigation systems garden irrigation system drainage systems green roofs news 260606

Access Protection Ltd access protection access controls emergency system access systems news 160206

ACDP study feasibility environmental engineering and feasibility report news 170506

Ace Fixings electrical products plumbing products construction tool building tools news 201106

Acheson & Glover building construction materials construction materials concrete block brick paving news 240206

ACO Building Drainage shower drain shower pipe shower waste bathroom waste news 210606

Action Storage Systems storage racking racking systems storage lockers shelving systems news 070706

Adams Rite door hinges barrel hinges door handles door knobs news 090306

Adams Rite door knobs door handles locking door cabinet hinges news 090306

Addagrip protective coatings concrete epoxy polyurethane resin floor coating news 070306

Addagrip resin bound surfacing resin bonded news 060406

Addagrip resin epoxy paint epoxy plastic coating concrete epoxy news 070306

Addagrip stone carpet protective coatings floor finish floor sealer news 080606

Addvent portable air conditioning air conditioning portable units news 020306

Advanced Ergonomic Technologies access floor air conditioning systems underfloor cooling office partitioning news 070406

Advanced Ergonomic Technologies access flooring demountable partitions room dividers air systems news 021106

Advanced Ergonomic Technologies access flooring flexible space underfloor cooling ventilation air conditioning news 210406

Advanced Ergonomic Technologies access flooring industrial air conditioning underfloor cooling news 310506

Advanced Ergonomic Technologies access floors access flooring raised access floors raised access flooring news 160306

Advanced Ergonomic Technologies duct air underfloor cooling commercial air conditioning access flooring news 091106

Advanced Ergonomic Technologies office partitioning access flooring air conditioner cooling news 250406

Advanced Ergonomic Technologies underfloor air conditioning air systems access flooring news 120406

Advanced Ergonomic Technologies Underfloor Air Conditioning underfloor cooling raised access flooring news 160306

Advanced Ergonomic Technologies underfloor cooling office air conditioning access floor office designs news 070606

Advanced Ergonomic Technologies underfloor cooling office partitions partition walls demountable partitions news 291106

 

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Abacus Lighting lighting solutions sports lighting landscape lighting industrial lighting