Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Advanced Ergonomic Technologies provide:-

access flooring flexible space underfloor cooling ventilation air conditioningaccess flooring
access flooring flexible space underfloor cooling ventilation air conditioningflexible space
access flooring flexible space underfloor cooling ventilation air conditioningunderfloor cooling
access flooring flexible space underfloor cooling ventilation air conditioningventilation air conditioning

Request Information

Home
Include Article
Advertise

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

 

 

   

Developer Cavanna cuts costs by building a 'home' for the future with AET

Market leading Hiross Flexible Space air-conditioning technology from AET, is helping to save costs and maximise building efficiency at Riviera Park - the modern, purpose-built headquarters of Torquay-based property developer, The Cavanna Group.

As one of the region’s largest independent housebuilders, The Cavanna Group has recently developed their own new 15000 sq ft HQ. at Riviera Park, Torquay. The Hiross Flexible Space System was specified for the project by consulting services engineers, Kelly Taylor & Associates who worked closely with The Cavanna Group to create an office which runs at maximum operating efficiency. The Hiross Flexible Space System is part of the AET Flexible Space Concept incorporating raised access flooring, Movinord Fully Demountable Partitioning and Electropatent power distribution systems. Its installation will provide Riviera Park occupants with high standards of air-conditioned comfort and bring The Cavanna Group significant financial and operational benefits over the life-time of the building.

“Working with AET has bought enormous benefits on this project,” explains David Franklin, Senior Associate with Kelly Taylor & Associates. “Not only is the Flexible Space System an energy efficient air-conditioning solution, its inherent flexibility also enables Riviera Park to be easily re-configured with minimum cost and disruption, to meet the future needs of this growing developer.”

Ordinary VAV or fan coil type air-conditioning systems are fixed, ceiling-based solutions which are acceptable in buildings where the layout of the office space remains exactly the same for the lifetime of its occupancy. However, office churn involving layout changes, inserting partitions, moving people, desks and walls is a fact of business life. This process significantly inhibits the capability of fixed air-conditioning systems to provide the comfortable environment for which they were initially designed. The Hiross Flexible Space System, however, offers a fundamentally different, more advanced and cost-saving approach.

At Riviera Park, Flexible Space has been installed across 8 zones of the open-plan and cellular offices of the two-storey Cavanna Group building. Each zone’s floor void, or plenum, is divided into two sections by a silicone covered barrier material; creating a supply air zone and a return air zone, very roughly splitting the plenum into two halves. Depending on the users requirements, either cooled or warmed air is driven into the supply air zone by a Conditioned Air Module (CAM). This air is then drawn up into the occupied space by fan-assisted terminal units (FTU). The FTU are recessed into the floor, plugged into an underfloor power source and connected by Cat5 data cabling for intelligent control. After thorough mixing in the office space, the used air travels back down into the plenum through grilles over the return air zone and, along with an injection of fresh air, passed through to the CAM. Here, it is filtered, has the humidity and temperature adjusted according to settings made both at the CAM and FTUs and is once again recirculated into the supply air channel.

Since the FTUs are not restricted by duct or pipe connections, any future changes The Cavanna Group wish to make to their office layout may be effected with minimum cost and disruption. Office IT and telecoms cabling as well as power supply systems are also concealed beneath the raised access floor, minimising workspace congestion and making any subsequent reconfiguration a straightforward task.

A recent CABE study has identified a 90% decrease in churn cost in a building with under-floor HVAC, power, telephone and data systems over a building with ceiling-based HVAC and a cellular floor. In the fourth edition of the British Council of Offices Specification Guide, improvements in business performance have been highlighted as achievable through the installation of an under-floor HVAC system in commercial buildings.

Email: sales@flexiblespace.com


CMR Catering Equipment commercial catering equipment commercial refrigerators catering kitchen equipment news 170106

Colt International air heat pumps smoke alarms air ventilation ventilation systems news 310706

Colt International air ventilation mechanical ventilation ventilation mechanical filter systems news 140706

Colt International Ltd ventilation systems air heat pump fume extraction industrial fans news 150806

Colt International smoke control ventilation mechanical air ventilation fume extractor news 140706

Colt International smoke control ventilation systems fume extraction air ventilation news 140706

Comar Architectural Aluminium Systems cladding materials exterior cladding architectural aluminium aluminium shopfronts 150206 news

Comar Architectural Aluminium Systems commercial doors curtain walling cladding systems folding sliding doors news 290906

Comar Architectural Aluminium Systems curtain wall folding sliding door sliding internal doors metal cladding news 190706

Comar Architectural Aluminium Systems entrance doors security doors sliding glass doors curtain walling news 070806

Comar Architectural Aluminium Systems exterior doors cladding systems curtain walling aluminium shopfronts news 241106

Comar Architectural Aluminium Systems folding sliding doors cladding systems cladding panels doors bifold news 251006

Comar Architectural Aluminium Systems shopfronts cladding systems doors entrance folding wooden doors news 210606

Comar Architectural curtain walling aluminium shopfronts doors bifold cladding panels news 260107

Comar Architectural roof cladding wall cladding cladding materials exterior cladding news 260107

Conder Products septic tanks sewage treatment wastewater treatment septic system news 260106

Conder Products sewage treatment plant waste water treatment water sewage news 120706

Conder Products waste water treatment sewage systems waste water drainage systems news 260106

Building design news reciprocal exchange links

Continental Underfloor Heating floor heating electric heating underfloor ufh water underfloor heating news 270206

Continental Underfloor Heating floor heating underfloor heating systems heating system news 240206

Continental Underfloor Heating heating under floor heating system radiant heat news 270206

Continental Underfloor Heating water underfloor heating radiant heat heating system news 270206

Continental Underfloor Heating underfloor heating systems underfloor electric heating undedrfloor cooling news 270606

Contrax Furniture Ltd shop counters shelving furniture wall shelving display shelving news 180406

Coolmation Ltd cooling towers air heat pumps heat pump air conditioning clean rooms news 270606

Crimp-Pak crimp tool cable ties crimp-pak wiring accessories news 280306

Danfoss Ltd variable speed drives ac motors inverter drive news 081106

Dart Valley Systems Ltd water conservation water usage water saving water efficiency news 160106

Dean & Bowes building services consultants building projects building services contractors news 010606

Dean & Bowes commercial retail fit outs commercial refurbishment building projects news 170706

Dean & Bowes mezzanine floor curtain walling facades fit out news 100806

Dean & Bowes office fit out building services contractors office refurbishments news 070606

Dean & Bowes shop fittings refurbishment contractors interior fitout news 120406

Decra Roof Systems Ltd steel tile systems roofing roofing tiles roofing construction news 081106

Delta Membrane Systems damp proof membrane waterproofing products membrane systems waterproofing news 271106

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Advanced Ergonomic Technologies access flooring flexible space underfloor cooling ventilation air conditioning