UFH and Building Regulations Part L
On 13th September 2005, the approved drafts for the
Building Regulations, Part L, Conservation of Fuel and
Power and Part F, Ventilation were published. Part L of
the new regulations looks specifically at conserving
fuel and power, reducing heat loss, improving energy
efficiency standards, providing better insulation and
ensuring more efficient heating systems in buildings.
Bill McConnel, Technical Director of Continental
Underfloor Heating (UFH) discusses how this change in
legislation will require builders to rethink their
design ideas and considers how the installation of UFH
can help to comply with the new regulations.
The changes correspond with the Government’s target of
reducing UK carbon dioxide emissions by 20% in 2010 and
are due to come into effect on 6th April 2006. The
Office of the Deputy Prime Minister suggests that the
proposed changes will save around one million tonnes of
carbon per year by 2010. Currently, buildings account
for 45% of the total use of energy within the UK and
this is obviously reflected in carbon emissions. Not
only will the proposed changes help to improve energy
efficiency within the home, it is also proposed that new
homes will see a 40% decrease in their domestic fuel
bills.
Principally, this article will consider ADL2A – a
document intended to give guidance in relation to works
comprising:
a) The construction of new buildings other than
dwellings;
b) Where it is deferred for any reason, the first
fit-out works in buildings that were built to comply
with Part L as amended in 2006.
c) The construction of extensions to existing buildings
where the gross floor area of the extension is greater
than 100m 2 and greater than 25% of the gross floor area
of the existing building.
The regulation requires a reduction of 20% in energy use
for air-conditioned buildings and a reduction of 15% for
naturally ventilated buildings. Additionally, the
regulation stipulates that if possible 10% of the energy
use should be derived from renewable energy sources.
The changes to regulation will have significant effects
on both builders and the end user. The approach to
building design will be fundamental, with energy saving
technologies being integrated into the building at a
much earlier stage of the design process. The end user
will also be required to conduct energy efficiency
monitoring.
The construction of the building will also be tightened
to improve energy efficiency, with lower U-values
required on all building elements, set targets for air
leakage and a reduction in cold bridges (areas in the
building where a gap occurs in the insulation).
So how can the installation of UFH help in complying
with the new regulations? UFH runs typically at a
maximum temperature of 50ºC and sometimes as low as 35º.
The flow temperature is largely dependent on the floor
construction, pipe spacings, water flow rate, heat
output required and the type of floor finish.
Condensing boilers and alternative heat sources such as
geothermal heat pumps, both work best at lower water
flow temperatures and are therefore suitable for use in
combination with UFH. The low flow temperature of UFH
(approximately 35ºC) can allow a boiler to operate at a
98% efficiency rate, opposed to only 88% when being used
in conjunction with a higher flow temperature system,
such as radiators.
When UFH is being installed, one of the key
considerations will be deciding whether to control the
temperature of the UFH water locally (at each manifold)
or centrally. Central control is justified when the
thermal resistance of the floor finishes are similar
throughout the building. Central temperature control has
several advantages:
1. The temperature of the water is kept to a minimum,
making full use of the condensing abilities of the
boiler
2. Distribution pipework temperatures are lower and
therefore pipework heat loss will be reduced.
3. Only one centralised speed controlled pump set is
required, opposed to having a centralised pump, plus
satellite pumps on each manifold. This can further help
to save energy and reduce capital cost.
UFH also emits a greater percentage of its heat as
‘radiant heat’ opposed to ‘convective heat’. This too
can make a difference, as people tend to feel
comfortable at lower air temperatures with a radiant
heat source than they do when the air is being solely
heated convectively. In practical terms, this is likely
to mean that the end user would reduce the temperature
required of their system by 1.0 to 1.5 degrees, further
improving overall energy efficiency.
With the Government’s drive to actively encourage the
use of renewable energy sources in new buildings, UFH
clearly has benefits. Heat pumps generally supply a
maximum water flow temperature of 45°C to 50°C, which is
an ideal temperature for UFH to operate effectively.
With this range of flow temperature, the COP
(Coefficient of Performance) of the heat pump would be
around three. This means that for each kilowatt of
electrical energy put into the heat pump, three
kilowatts of useful heat should be produced. This figure
can be increased with careful design of the UFH system
and choice of floor finishes. The more insulative the
floor finish, the higher the flow temperature required
by the UFH.
The new building regulations will force builders to
consider different methods of achieving, and if
possible, exceeding the targets of the new regulations.
As this article demonstrates, UFH in combination with
modern condensing boilers or alternative heat sources is
well positioned to help achieve these targets.
Continental UFH offers the most comprehensive range of
UFH systems in the UK and has an expert technical team
on hand to provide customer advice.
Email:
info@continental-ufh.co.uk
Autodesk sustainable architecture sustainable building design construction
software news 010606
Autopa smoking shelters car park barriers parking posts parking bollards news
080206
Autopa smoking shelters parking posts cycle shelters vehicle barrier news 190406
AVK SEG electric generators diesel generators power generator standby generator
news 090106
AVK|SEG-LSLN diesel power generator power protection electricity generator power
transformer news 131106
AVK|SEG-LSLN ups system power protection power generators industrial generators
news 200206
AVK|SEG standby power industrial generators diesel power generator silent
generators news 260108
Bachy Soletanche Ltd environmental engineering sheet piling piling construction
ground anchors News 170107
Batchelor Electrical Ltd membrane roof roofing products solar roofing
photovoltaic systems news 211206
Baxi Technologies combined heat and power chp systems geothermal heating news
230206
Baxi Technologies combined heat and power space heating heating solutions news
230206
Baxi Technologies commercial boilers boilers heating combined heat and power
news 160106
Baxi Technologies commercial heating combined power heat geothermal power news
160106
Baxi Technologies geothermal power power generation boilers heating combined
heat and power news 160106
Baxi Technologies heating geothermal combined heat and power commercial heating
news 230206
Belimo linear actuators ventilation systems industrial valves linear motor news
300106
BIGStudio Glass Design Ltd glass design decorative glass glass sculpture stained
glass windows news 140906
Big Studio Glass Design Ltd glass sculpture decorative glass stained glass
windows news 160206
Bilco UK fire detection fire protection smoke vents fire safety news 070406
Blackpool Pleasure Beach Rides and Entertainment amusement rides roller coaster
ride News 160107
Blucher wet bathroom underground drainage drainage pipes drainage products News
150107
Bosch Security Systems cctv camera systems remote cctv dome cctv camera news
210506
Bosch Security Systems home security alarms security video security alarm
systems 300806
Bosch Security Systems ip solutions cctv camera systems dome cctv camera news
161006
Bosch Security Systems network ip camera ip security camera video security
system news 030706
Bosch Security Systems security surveillance systems security camera system
security video equipment news 270406
Bosch Security Systems security video equipment security alarm systems cctv
systems news 040406
Bosch Security Systems security video equipment wireless security camera outdoor
security camera news 120906
Bosch Security Systems surveillance video cameras cameras security systems dome
cctv camera news 040406
Bosch Security Systems video recording manager cctv system cctv security cameras
pa sound systems news 240306
Bosch Security Systems video recording surveillance camera ip cameras security
camera systems news 120406
Bosch Security Systems video surveillance video security surveillance cameras
security camera system news 240706
Bosch Security Systems wireless cctv camera cctv security system ip network news
151106
Bosch Security Systems wireless ip camera wireless security camera surveillance
systems news 210806
Briggs & Forrester building maintenance services mechanical building services
electrical building services news 030206
Briggs & Forrester building services contractors building refurbishment
mechanical services news 090106
Briggs & Forrester building services contractors building services electrical
news 220606
Briggs & Forrester building services contractors building services electrical
commercial contractors news 200706
Arundel Jones Associates Ltd Registered in England and Wales No.
07334149 Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL Tel : 01622 745333
email copyright all rights reserved
News Categories : Continental Underfloor
Heating water underfloor heating radiant heat heating system
|