Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Knauf Drywall provide:-

plaster board insulation board dry lining building insulationplaster board
plaster board insulation board dry lining building insulationinsulation board
plaster board insulation board dry lining building insulationdry lining
plaster board insulation board dry lining building insulationbuilding insulation

Request Information

Home
Include Article
Advertise
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

 

 

   

Knauf Drywall system at Core of Airport Development

A specialist drylining system from Knauf Drywall has won a “core” role in the development of the new Terminal 5 (T5) at Heathrow Airport, London. The Knauf Shaftwall system was specified for six service cores in the 440 metre-long satellite building, T5B. The cores, which extend over three, six and seven floors, contain stairs, lifts and service shafts.

Knauf Shaftwall is ideal for applications such as high rise buildings and infrastructure developments because it combines superior fire resistance and durability in the long term with ease of installation and cost effectiveness. Its special profile steel studs allow Knauf Shaftwall to be installed from one side, avoiding the need for scaffolding – or complicated fixing – inside the shaft.

T5B is part of the massive £4.2 billion development which is located on 260 hectares at the western boundary of the airport, and is due to open in 2008. When fully complete, T5 will provide Heathrow Airport with the capacity to handle up to 35 million additional passengers a year.

As a supplier to fit-out contractor Mansell Construction Services, drylining subcontractor Astins has installed 27,000m2 of walling – mostly Knauf Shaftwall. With much of the drywall construction involving several layers, this totals about 100,000m2 of board.

Most of the Knauf Shaftwall installation in T5B consists of 146mm Knauf ‘C-T’ steel studs supporting 19mm Knauf Coreboard. This is faced on the room side with two layers of 15mm Knauf Fire Moistureshield, a high performance plasterboard providing added protection against dampness.

The 178mm construction used at T5B typically provides up to two hours’ fire resistance and reliable protection for firefighters. It also provides 45dB (Rw) sound reduction – or 50dB with a 25mm insulation quilt in the void. Higher sound reduction performance can be achieved with additional layers of board and/or thicker insulation quilts.

As Knauf Coreboard is also fire and moisture resistant, shaft enclosures can be built before a building is weather-sealed.

Knauf Shaftwall is engineered for lift shafts in high-rise buildings. Its panels and fixings withstand sharp variations in air pressure when fast-moving lift cars are passing. The Knauf Coreboard facing into the shaft is normally unfinished, while the high performance boards on the room side are finished as normal partitioning.

Knauf Drywall manufactures a full range of plasters, plasterboards, insulating laminates, drywall accessories, metal sections and steel building systems, for domestic and commercial applications, from factories at Sittingbourne in Kent and Immingham on Humberside.

Email: bstark@knauf.co.uk


Briggs & Forrester building services contractors building services electrical construction contractor news 140606

Briggs & Forrester building services contractors commercial contractors building services electrical news 060706

Briggs & Forrester building services contractors Contracting Building Services Specialists news 280306

Briggs & Forrester building services contractors hvac contractors building services companies news 190506

Briggs & Forrester building services engineers building contractor construction contractors news 090106

Briggs & Forrester construction contractors building services contractors building services companies news 210406

Briggs & Forrester engineering building services building services electrical hvac contractors news 190106

Briggs & Forrester Group building services contractors electrical contracting construction contractors news 261006

Briggs & Forrester Group building services contractors engineering building services electrical building services news 231006

Briggs & Forrester Group building services contractors engineering contractors building contractor news 220806

Briggs & Forrester Group building services engineering building services contractors building contractor news 220806

Briggs & Forrester Group building services engineering building services contractors construction contractors news 290906

Briggs & Forrester hvac contractors commercial contractors building services contractors news 160106

Briggs & Forrester hvac services building services contractors construction contracting news 050606

British Gypsum ceiling panels plaster board gypsum plaster dry wall news 100206

British Gypsum ceiling tiles british gypsum plasterboard ceiling wall plaster news 270906

British Gypsum ceiling tiles plasterboard ceiling dry lining british gypsum news 100206

British Gypsum dry lining walls wall plasterboard walls plaster news 301006

British Gypsum dry wall plaster board gypsum plaster dry lining walls news 131106

British Gypsum gypsum board dry wall plaster board plasterboard ceiling news 301006

British Gypsum gypsum plaster plaster boards gypsum board plastering materials news 040706

British Gypsum Ltd dry lining cement board wall plaster plaster board news 210906

British Gypsum Ltd dry lining plaster board gypsum british wall plaster news 020806

British Gypsum Ltd gypsum plaster british gypsum plaster boards plaster ceiling news 260606

British Gypsum Ltd plaster board british gypsum wall plaster dry lining news 220806

British Gypsum Ltd walls plaster gypsum plaster plasterboards plasterboard ceiling news 140706

British Gypsum plasterboard ceiling dry lining british gypsum walls plaster news 071106

British Gypsum plaster board gypsum plaster wall plaster coving plaster news 041006

British Gypsum plaster board wall plaster dry lining gypsum plaster news 100206

British Gypsum wall plasterboard plasterboard ceiling dry lining gypsum plaster news 131106

British Gypsum wall plasterboard walls plaster drylining british gypsum news 190706

British Harlequin dance floors portable dance floor sprung floor floor coverings news 220806

British Harlequin plc non slip floor dance floor stage floor dancefloors news 181206

British Harlequin plc portable dance floor hire parquet dance floor dance floor news 181206

British Harlequin plc portable dance floors dance flooring sprung floor anti slip floor news 181206

British Harlequin plc sprung dance floor portable dance floor anti slip floor news 181206

British Harlequin plc sprung dance floor portable dance floors dance flooring news 181206

British Harlequin plc sprung floor anti slip floor portable dance floors news 181206

 

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Knauf Drywall plaster board insulation board dry lining building insulation