New medical centre streamlines patients
The new cardiac-catheter unit at the 700 bed Frimley
Park Hospital in Surrey will streamline patients who
would otherwise have to travel to St George’s Hospital
in London for consultation before possibly requiring
heart surgery. The new centre is equipped with highly
sophisticated angiography equipment that enables the
cardiology team at Frimley to offer a local service, for
local people, some of whom may have to be referred St
George’s for angio or other treatments at a later date.
The new two storey building linked to the main hospital
complex was factory built, delivered and assembled on
site over four weekends. On site finishing and fitting
out work took the total contract time to just 22 weeks.
According to Leon Chasteauneuf the hospital’s project
manager, the design of the building was conceived
in-house, with Neath Abbey based modular building
manufacturer Wernick Buildings producing detailed
construction drawings and project managing the
installation.
Dominating the lead lined cardiac-catheter angiography
suite is a 2 tonne, ceiling mounted C-Arm, which enables
cardiologists to use x-ray imaging to visualise coronary
arteries and the heart chamber. Patients will spend
approximately 4½ hours at the hospital and about 20
minutes in the angio suite where an x-ray (contrast
media) dye is injected into their blood vessels,
allowing them to be visible on the x-ray monitor. The
cardiologist monitors the flow of dye to identify where
surgery, or treatment, may be required to improve the
flow of blood through the patient’s vessels. When the
unit goes live it is anticipated that eight patients can
be seen every day, with that number possibly increasing
as the new system becomes more efficient with use.
The new £2m Frimley unit offers great financial savings
with a lean, local build-up to surgery or treatment
where it is found to be necessary, but crucially, the
well-being of patients is greatly enhanced as they will
not have to travel into London for this diagnostic test.
Healthcare providers are finding that where new hospital
buildings have to be brought on-line quickly because of,
for instance, government initiatives, or delays in
funding, it is often modular construction specialists
who are called in to produce the building ‘on
programme’. Mr Chasteauneuf has specified modular
construction before and was already convinced that this
was the best route for the new Frimley building. When
speed is a vital consideration, then fast-track modular
accommodation is usually the only realistic option. With
waiting lists continuing to be key product indicators
for many healthcare providers, this construction method
is becoming an increasingly popular way of achieving a
high quality end result quickly.
Wernick Buildings won the Frimley contract in open
tender against five other companies. For Mr Chasteauneuf
and his team a realistic time-scale, quality of the
completed product as well as price were important
factors. He later commented that, “The finish achieved
by Wernick is superb”.
The first floor contains offices and a computer room
that will be used by the hospital’s clinical teams. A
plant room for the air conditioning system serving the
entire building is also included on the first floor.
Email:
jeff.bownds@wernick.co.uk
Polyflor Ltd safety flooring commercial flooring vinyl floor tiles floor
covering news 260706
Polyflor Ltd sheet vinyl flooring playground surface safety surface vinyl sheet
news 120706
Polyflor Ltd sports surfaces safety flooring sheet vinyl flooring vinyl floor
covering news 300506
Polyflor safety flooring sports surfaces flooring tile commercial flooring news
200406
17-Polyflor safety flooring sports surfaces non slip flooring News 010508
Polyflor safety flooring sports surfaces non slip flooring floor coverings news
070406
Polyflor sports surfaces floor safety commercial flooring vinyl floors news
290606
Polyflor Sports Surfaces Safety Flooring news 210606
Poujoulat (UK) Ltd chimney construction steel chimney chimney uk news 280706
Poundfield Products brick ties wall system block system masonry reinforcement
news 190106
Poundfield Products concrete retaining wall retaining blocks brick ties wall
system news 190106
Poundfield Products Ltd retaining wall blocks wall systems brick ties news
020606
Poundfield Products retaining blocks brick ties wall system block system news
190106
Poundfield Products wall ties cavity wall ties masonry support systems news
130306
Poundfield Products wall ties cavity wall ties wall block masonry brick news
270606
Poundfield Products wall ties masonry wall concrete retaining wall retaining
blocks news 190106
PRI Limited energy metering electricity metering power management system news
120706
PRI Limited energy metering energy management software energy management systems
news 120706
Propencity Group building service construction services building work building
development news 140906
Pure Window Water Company pure water systems reverse osmosis system window
cleaning system News 100107
Quinn Plastics Ltd roof glazing plastic sheeting plastic roof sheets plastic
roofing news 280406
Quinn Plastics plastic roofing plastic roof sheets lightweight roofing roofing
material news 160106
Quinn Plastics polycarbonate roofing commercial roofing sheet roofing
polycarbonate roofing sheets news 170206
Rainbow Professional tree surgery landscaping trees tree protection tree
services news 100106
Ransfords facing bricks mortar bricks brick suppliers wall bricks news 210606
Real Door Company hardwood doors internal doors uk bespoke doors news 040506
Arundel Jones Associates Ltd Registered in England and Wales No.
07334149 Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL Tel : 01622 745333
email copyright all rights reserved
News Categories : Wernick Buildings Ltd
building portable modular construction temporary office portable
buildings
|