NHS provides answer to impossible deadlines
A change to building specs that’s just not possible
in the project time frame? This client knew where to go
for the answer and Wernick provided it.
For George Rankin and his team at Studio Four Architects
in Romsey it was just another interesting day nursery
project, similar in many ways to another building they
had recently completed for the Southampton University
Hospitals NHS Trust. But this one was due to change
radically before the ink had dried on the agreed sketch
drawings and specification when the client stipulated
that an extra 879 square metre floor of offices for the
Southampton City Primary Care Trust needed to be added
above the 1063 square metre ground floor day nursery,
crèche and training centre. This was not the first time
in his 35 year career that George had been confronted
with a challenge like this, but he knew that this
addition to the design for the Trust Taplins Childcare
Department at the Western Community Hospital was just
not possible using traditional construction techniques
within the time frame imposed by funding constraints.
Fourteen months had been allowed for the project from a
‘cold start’ through briefing, full design, approvals,
tender and completion of the site construction, and the
days were disappearing fast! It was the client who came
up with the solution – modular build, but George freely
admits that this was one of those rare occasions when he
had to swallow his professional pride, “Because”, as he
explained later, “modular would not have been my first
choice of build technique”. As it turned out George and
the client were delighted with the end result that came
complete with a traditional brick skin and pitched roof.
The funding arrived on time and the project was
completed within budget, on time.
Modular specialists Wernick Buildings won the factory
build project in a competitive open tender against stiff
competition from three other companies because they were
able to offer a cost-effective, traditional-looking
building, constructed under tight quality control
conditions at their manufacturing plant in South Wales,
and all completed within the tight programme
requirements.
With funding from seven different bodies the new £2.3m
facility has space for 100 children. Half the places are
allocated to children whose parents work in the local
NHS, with the remaining 50 allocated to children from
families living in the local community. In addition to
the nursery, there is a training suite on the ground
floor, complete with IT room and separate crèche, which
is available to staff and child-care providers such as
the Early Years Partnership, who require a training
resource in the area.
In addition to the usual childcare amenities, the Centre
has indoor and outdoor play areas, quiet rooms and
sleeping areas. The nursery is managed by Taplins, the
internal childcare department of Southampton University
Hospital Trust.
Nursery Manager, Sam Hollins commented, “It’s a great
new child care provision for the local area, with a safe
and inspiring environment in which children can be
professionally cared for. We particularly like the
all-weather garden which is covered in ‘no mow’ grass
that looks and feels really convincing”.
So after a thumbs-up from the design professionals and a
thumbs-up from the childcare professional end users,
does George Rankin think that architects know enough
about modern modular building techniques? “Definitely
not”, he stated, “We are not fully aware of its
strengths and weaknesses. For some sites it’s ideal and
for other sites, as we found out, it’s the only answer!
The majority of people would never guess that this
project, with its brick skin and traditional roof, is
not a traditional build. Architects need to sit down and
develop modular principles with companies such as
Wernick as we are not fully aware of the system’s full
potential, and when we get a panic job like this one
there is just is not the time to investigate the
technique fully”.
Email:
sales@wernick.co.uk
British Gypsum wall plasterboard walls plaster drylining british gypsum news
190706
British Harlequin dance floors portable dance floor sprung floor floor coverings
news 220806
British Harlequin plc non slip floor dance floor stage floor dancefloors news
181206
British Harlequin plc portable dance floor hire parquet dance floor dance floor
news 181206
British Harlequin plc portable dance floors dance flooring sprung floor anti
slip floor news 181206
British Harlequin plc sprung dance floor portable dance floor anti slip floor
news 181206
British Harlequin plc sprung dance floor portable dance floors dance flooring
news 181206
British Harlequin plc sprung floor anti slip floor portable dance floors news
181206
British Harlequin plc wood floors portable dance floor hire parquet dance floor
news 181206-1
British Wood Preserving and Damp-proofing Association wood protection damp
proofing contractors damp treatment news 250506
C & B Systems toilet cubicles toilet fittings uk bathrooms sanitary ware news
120706
C & B Systems cubicles toilet sanitaryware bathroom wc wc toilet news 030506
CABE sustainable construction sustainable buildings build green sustainable
design News 200709
Cabinco timber buildings timber lodge log building log cabin manufacturers News
150107
Cablofil cable tray cable trunking electrical cable wire cables news 250906
Capital Marble ceramic wall tiles floor ceramic tiles flooring tile news 131006
Capital Marble grout tiles adhesive tiles ceramics tiles wall finish news 201006
Carillion plc building civil engineering construction engineering civil
engineering services news 221206
Carlyle Environmental Ltd ground source heat pumps ground heat pumps news 160106
Carrier Air Conditioning air conditioning systems fan coils air handling units
news 031106
Carrier Air Conditioning air handling units water chillers air conditioning
mobile news 050506
Carrier Air Conditioning air heat pumps split air conditioner portable air
conditioning news 240806
Carrier Air Conditioning cooling towers air chiller water chillers heat cooling
news 060406
Carrier Air Conditioning cooling towers portable air conditioning home air
conditioning news 220906
Carrier Air Conditioning heat exchangers air handling units commercial air
conditioning news 060406
Carrier Air Conditioning heat pumps heat recovery fan coil air heat pumps news
060406
Carrier Air Conditioning heat recovery heat exchangers air conditioning units
water chiller news 060406
Carrier Air Conditioning hvac heating heating unit air conditioning portable
news 061006
Carrier Air Conditioning industrial air conditioning air conditioning portable
air conditioners news 310706
Carrier Air Conditioning portable air conditioning air conditioning systems air
handling units news 070406
Carrier Air Conditioning portable air conditioning unit air conditioning systems
air handling unit news 060406
Carrier Air Conditioning portable air conditioning unit air heat pumps fan coils
news 040506
Carrier Air Conditioning portable air conditioning units air handling units
cooling towers news 040506
Carrier Air Conditioning split system air conditioners split air conditioner VRV
condensers news 060406
Carrier Rental Systems cooling air conditioning air conditioning hire chiller
rental News 200709
Carrier Rental Systems heating hvac air conditioning mobile heating and cooling
News 200709
Ced Limited driveway paving paving blocks stone paving paving materials news
200706
CentraLine air conditioning systems heating controls hvac air conditioning news
260906
Centraline central heating systems commercial heating heating controls news
250906
Centraline City air conditioning systems temperature humidity air quality news
130306
Arundel Jones Associates Ltd Registered in England and Wales No.
07334149 Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL Tel : 01622 745333
email copyright all rights reserved
News Categories : Wernick Buildings Ltd modular
building installer prefabricated buildings modular buildings
|