Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Wernick Buildings Ltd
provide:-

modular buildings portable buildings modular office modular constructionmodular buildings
modular buildings portable buildings modular office modular constructionportable buildings
modular buildings portable buildings modular office modular constructionmodular office
modular buildings portable buildings modular office modular constructionmodular construction

Request Information

Home
Include Article
Advertise
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

 

 

   

Would you ever guess this was modular?

When Michael Hadfield received the brief for a new 316 square metre Social Services Day Centre at Brigg, in North Lincolnshire, he knew immediately that there was only one way he could complete the thirteen week project on time and within budget, whilst still keeping the Centre, which comprised two separate buildings, operational. Using a modular building system was the only option.

As senior architect for North Lincolnshire Council, Michael had to source a number of bids to satisfy the council’s procedural requirements. Neath Abbey based Wernick Buildings came up with the best interpretation of the brief, and after a meeting with the company’s design team and project manager, at which time as Michael put it, “All the cards were laid on the table regarding the difficulties of limited access, a short programme time and a finite budget, plus the fact that existing ‘active’ buildings were to remain operational. My requirements of the company building the Centre were demanding, but it was clear from the first meeting with the Wernick team, that they had the experience and detailed design solutions to undertake the project and all the logistical problems that came with it. I can only say that their adept and professional attention to detail never wavered during the whole contract period, even when the pressure increased”.

All end users are extremely pleased with the result. Lynne Smith, who is the present team leader of the Resource Centre, manages the day-to-day operations with the help of twenty support workers. They provide a day service for forty-five clients, all of whom have varying degrees of learning disabilities. “Our objective”, as Lynne explained, “is to assist our Adult Services clients to comfortably integrate into society. This is achieved by helping with every suitable opportunity that society offers, from attending adult education classes, to taking work placements, enjoying a visit to the pub, or playing a game of snooker.” A number of the Centre’s clients demand a high degree of personal care. This required that the building was completely wheelchair accessible and suitably equipped with special fire safety doors. “The new building works well in every respect”, continued Lynne, “the art room, for example, complete with patio doors leading to a covered veranda, is fantastic and has become a firm favourite with all clients and staff”.

Would you guess this was modular? The art room veranda and sensory garden at the Brigg Resource Centre

Michael Hadfield achieved great personal satisfaction with the end result of the Day Centre at Brigg. Originally, there were three buildings on the site, together with a number of mature trees. It was considered important to retain the trees, as part of the council’s environment policy and as part of future landscaping proposals.

The project was completed while the Centre was still operational, with its full compliment of clients. One of the three buildings had to be demolished at an early stage; a second building was later sold for demolition and residential development. The new building now also includes the local resident’s association office and was attached to the main Centre building by a link corridor. “We have only achieved this positive end result on time and within budget with all the demanding restrictions that the project presented by using an off-site, factory build system”, concluded Michael, “When I saw the completed job I knew that most people would never believe that the building is modular. It was a pleasure to work with Wernick”.

Email: sales@wernick.co.uk


British Gypsum wall plasterboard walls plaster drylining british gypsum news 190706

British Harlequin dance floors portable dance floor sprung floor floor coverings news 220806

British Harlequin plc non slip floor dance floor stage floor dancefloors news 181206

British Harlequin plc portable dance floor hire parquet dance floor dance floor news 181206

British Harlequin plc portable dance floors dance flooring sprung floor anti slip floor news 181206

British Harlequin plc sprung dance floor portable dance floor anti slip floor news 181206

British Harlequin plc sprung dance floor portable dance floors dance flooring news 181206

British Harlequin plc sprung floor anti slip floor portable dance floors news 181206

British Harlequin plc wood floors portable dance floor hire parquet dance floor news 181206-1

British Wood Preserving and Damp-proofing Association wood protection damp proofing contractors damp treatment news 250506

C & B Systems toilet cubicles toilet fittings uk bathrooms sanitary ware news 120706

C & B Systems cubicles toilet sanitaryware bathroom wc wc toilet news 030506

CABE sustainable construction sustainable buildings build green sustainable design News 200709

Cabinco timber buildings timber lodge log building log cabin manufacturers News 150107

Cablofil cable tray cable trunking electrical cable wire cables news 250906

Capital Marble ceramic wall tiles floor ceramic tiles flooring tile news 131006

Capital Marble grout tiles adhesive tiles ceramics tiles wall finish news 201006

Carillion plc building civil engineering construction engineering civil engineering services news 221206

Carlyle Environmental Ltd ground source heat pumps ground heat pumps news 160106

Carrier Air Conditioning air conditioning systems fan coils air handling units news 031106

Carrier Air Conditioning air handling units water chillers air conditioning mobile news 050506

Carrier Air Conditioning air heat pumps split air conditioner portable air conditioning news 240806

Carrier Air Conditioning cooling towers air chiller water chillers heat cooling news 060406

Carrier Air Conditioning cooling towers portable air conditioning home air conditioning news 220906

Carrier Air Conditioning heat exchangers air handling units commercial air conditioning news 060406

Carrier Air Conditioning heat pumps heat recovery fan coil air heat pumps news 060406

Carrier Air Conditioning heat recovery heat exchangers air conditioning units water chiller news 060406

Carrier Air Conditioning hvac heating heating unit air conditioning portable news 061006

Carrier Air Conditioning industrial air conditioning air conditioning portable air conditioners news 310706

Carrier Air Conditioning portable air conditioning air conditioning systems air handling units news 070406

Carrier Air Conditioning portable air conditioning unit air conditioning systems air handling unit news 060406

Carrier Air Conditioning portable air conditioning unit air heat pumps fan coils news 040506

Carrier Air Conditioning portable air conditioning units air handling units cooling towers news 040506

Carrier Air Conditioning split system air conditioners split air conditioner VRV condensers news 060406

Carrier Rental Systems cooling air conditioning air conditioning hire chiller rental News 200709

Carrier Rental Systems heating hvac air conditioning mobile heating and cooling News 200709

Ced Limited driveway paving paving blocks stone paving paving materials news 200706

CentraLine air conditioning systems heating controls hvac air conditioning news 260906

Centraline central heating systems commercial heating heating controls news 250906

Centraline City air conditioning systems temperature humidity air quality news 130306

 

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Wernick Buildings Ltd modular buildings portable buildings modular office modular construction